From: Exit News
The Prosecutor’s Office of Lezhe has launched an investigation into the construction of a hydropower plant in Mirdite.
Case prosecutor Sabri Kastrati opened an investigation following a report filed by residents of the area and their protest on Friday, Shqiptarja.com reported on Tuesday.
They claim that the company “Sang1” has falsified the signatures in the legal documents to obtain the permit for the construction of the hydropower plant.
Read more: Residents in Mirdite Protest Over Proposed Hydropower Plant Construction